Retain useful existing structure
Evaluate extensive renovation when the existing building supports the desired layout and performance. Test its constraints before assuming that retention is automatically the simplest option.
Before refining architectural style or finishes, establish what the property can support, how the home will meet the ground, and how people, water, and utilities move through the site. An early feasibility package gives architecture, interiors, engineering, and construction decisions a shared foundation. A beautiful floor plan is only useful when it can become a coherent project on the actual land.
Evaluate extensive renovation when the existing building supports the desired layout and performance. Test its constraints before assuming that retention is automatically the simplest option.
Compare demolition, site reuse, new foundations, utility conditions, and the review process with the compromises of retaining the house. Rebuilding is not an automatic approval shortcut.
Establish buildable area, access, utilities, and site work before treating the land purchase as the principal site cost. Coordinate future outdoor areas or secondary structures early in the plan.
Use this checklist to prepare for the first conversation. It is a planning aid, not a permit checklist or an assertion that every item applies to your home.
Compare proposals on included work, not just the bottom line. These are the cost drivers to discuss for your property.
No countywide price can replace a defined scope. Ask which items are confirmed, which are allowances, and which remain excluded.
Read our broader custom-home construction guide ↗Contra Costa is a service area—not one permit office. Verify the parcel, scope, and current requirements with the authority that reviews the work.
The County's residential checklist brings together construction drawings, energy documentation, structural/site material, and applicable agency approvals. Use it as a preparation reference, not as a universal municipal approval sequence.
County — single-family residential submittal checklist (PDF) ↗New buildings on vacant land in the Hillside Overlay District can involve siting/massing review before final design and site-impact review. Establish the site strategy before treating a floor plan as final.
Lafayette — hillside development permits ↗Coordinate the envelope, glazing, heating/cooling, water heating, and electrical strategy with the applicable current energy-compliance path. Use the California Energy Commission's current single-family guidance instead of an older code-year checklist.
California Energy Commission — single-family compliance guidance ↗Planning guidance reviewed September 12, 2026. Codes, programs, and agency processes can change. These sources are not endorsements of Barcci Builders. Compare county, city, and town review paths ↗
Selected Barcci projects from our Bay Area portfolio. These are real project photographs with their actual locations—not representations of completed Contra Costa work.
Clear starting points for the decisions ahead. Your address and scope determine the final requirements.
You can explore a design brief, but establish constraints before fixing the footprint. Topography, access, utilities, easements, and the applicable review path can change the design substantially.
No. The property determines the planning authority and building-services arrangement. Incorporated jurisdictions can have their own processes or use county building services; confirm the actual parcel rather than its mailing address.
During the initial layout and systems discussions. Envelope, windows, equipment, and electrical decisions affect each other. The team should establish the current compliance requirements and route applicable to the scope before those decisions are locked in.
A proposal needs the property and defined scope. Important cost drivers include site preparation, excavation, export, and retaining structures; foundation strategy and structural spans; utility extensions and service conditions; building shape, glazing, and roof complexity; envelope, hvac, interior, and exterior specifications; consultants, reviews, access, and unresolved site conditions. We separate assumptions, allowances, and exclusions rather than treating a countywide figure as a quote.
First establish design readiness, applicable approvals, material availability, site access, and the agreed construction scope. Agency review and existing conditions can affect the sequence. Discuss your target date with us; a website guide is not a promised start date.
Barcci Builders is headquartered in Los Gatos and serves the listed Contra Costa communities. Its project galleries identify the actual locations of completed Bay Area work. This service guide is not a claim of a Contra Costa branch office or a local project record.
Explore the design considerations and local review paths for your part of Contra Costa County.
A more personal home, considered down to the last detail.
City / townMake the home you love work beautifully for the life you live.
City / townAn addition should feel like it always belonged.
City / townMore light, better flow, and details that make everyday life easier.
Unincorporated communityReimagine the layout. Respect the setting.
City / townA considered transformation, from the kitchen to the hillside.
City / townKeep what makes the setting special. Rethink how the home lives.
City / townRoom to gather. Space to retreat. A home that works as one.
Unincorporated communityPreserve the character. Make room for what comes next.
Tell us the property’s community and what you want to change so we can discuss the right scope and next steps.