Skip to main content
ADU built by Barcci Builders

Accessory Dwelling Units

Bay Area ADU Builder

Detached ADUs, garage conversions, JADUs, and attached ADUs — feasibility, design, permits, and construction. CA License #1086047.

Free Feasibility Assessment
4
ADU Formats Explained
23
Bay Area Cities Served
2026
State Guidance Reviewed
116
Projects Reported Company-Wide

What Is an ADU in California?

An Accessory Dwelling Unit (ADU) — sometimes called a granny flat, in-law unit, backyard cottage, or secondary suite — is a self-contained residential unit on the same lot as a primary single-family or multifamily home. ADUs have their own entrance, kitchen, bathroom, and sleeping area, and can be rented independently or used for multigenerational living.

California's ADU law creates statewide pathways for adding housing, while local ordinances and property conditions still matter. The California Department of Housing and Community Development published an ADU Handbook updated in March 2026 that explains the current rules and changes effective January 1, 2026.

An ADU can create flexible space for family, long-term housing, or potential rental use. Financial outcomes depend on the site, financing, taxes, insurance, local rents, and final project cost, so they should be evaluated with current local comparables and qualified advisors.

Types of ADUs We Build

Every property is different. We evaluate these four ADU formats against your site, goals, local rules, utilities, and budget.

Detached ADU built by Barcci Builders

Detached ADU

A fully separate structure in your backyard, with its own foundation, utilities, and address. Maximum privacy and the most rental income potential.

Cost estimate
$200,000 – $400,000+
Size
Up to 1,200 sq ft
Timeline estimate
10–14 months
  • Maximum privacy
  • Full kitchen & bath
  • Highest rental income
  • Largest size allowed
Attached ADU built by Barcci Builders

Attached ADU

An addition connected to your main home that functions as a fully independent unit — separate entrance, kitchen, and bathroom.

Cost estimate
$150,000 – $280,000
Size
Up to 50% of main home
Timeline estimate
9–13 months
  • No new foundation
  • Shared wall saves cost
  • Flexible layout
  • Good for multigenerational living
Garage Conversion built by Barcci Builders

Garage Conversion

Convert your existing attached or detached garage into a comfortable, permitted living unit. Fastest and most cost-effective ADU type.

Cost estimate
$100,000 – $180,000
Size
Existing garage size
Timeline estimate
6–10 months
  • Lowest cost
  • Existing structure
  • Fastest timeline
  • No new footprint
Junior ADU (JADU) built by Barcci Builders

Junior ADU (JADU)

A self-contained unit up to 500 sq ft carved from within your existing home's footprint — typically a converted bedroom, bonus room, or interior garage.

Cost estimate
$60,000 – $130,000
Size
Up to 500 sq ft
Timeline estimate
4–8 months
  • Lowest cost option
  • No new footprint
  • Fastest permits
  • Interior location

ADU Floor Plans

From studios to full 2-bedroom units — every floor plan is custom-designed for your lot. Click any plan to explore layouts, finish packages, and rental income estimates.

Click to expand — see floor diagrams & finishes

Every floor plan is custom-designed for your specific lot, setbacks, and goals. We don't sell cookie-cutter plans.

Start Your Custom Floor Plan

ADU Design Styles

Your ADU should look like it was always meant to be there. We design every unit to match or complement your main home's architecture — and the style of your neighborhood.

Click any style to see more photos and architectural details.

See Your ADU in 3D Before We Break Ground

When included in scope, 3D views help review exterior form, interior layout, materials, and finish direction before permit submittal. Approved documents and the signed scope control the build.

Request a 3D Design Preview
3D ADU design rendering by Barcci Builders

ADU Cost in the Bay Area

These Barcci planning ranges are not quotes or market averages. Actual pricing depends on design, site access, utilities, existing conditions, selections, and jurisdiction.

ADU TypeBay Area Cost RangeMajor scope variables
JADU (Junior ADU)$60K – $130KExisting layout, egress, kitchen, sanitation, electrical and fire/life-safety work
Garage Conversion$100K – $180KFoundation and slab condition, ceiling height, utilities, envelope and code upgrades
Attached ADU$150K – $280KNew foundation, structural tie-in, utilities, roof geometry and finish level
Detached ADU$200K – $400K+Site work, trenching, foundation, utility capacity, size, access and selections

Illustrative Budget Allocation

These percentages are a planning framework, not a record of past project averages. A property-specific estimate can shift the allocation substantially.

25–30%
Foundation & Framing
Slab or crawlspace foundation, wood framing, sheathing
20–25%
Mechanical, Electrical & Plumbing
New utility connections, HVAC, electrical panel, plumbing rough-in
10–15%
Exterior Finishes
Siding, roofing, windows, doors, insulation
20–25%
Interior Finishes
Flooring, cabinetry, countertops, tile, fixtures, paint
8–12%
Permits & Engineering
Architectural plans, structural engineering, city fees, Title 24
5–10%
Site Work
Grading, utility trenching, walkways, landscaping repairs

California ADU Regulations in 2026

California has some of the most ADU-friendly laws in the nation. Here's what applies statewide — plus what varies by Bay Area city.

California State ADU Rules

  • Size: Local maximums must allow at least 850 sq ft, or 1,000 sq ft for more than one bedroom; other pathways vary
  • Setbacks: 4-foot rear and side setbacks for ADUs up to 16 ft tall; 0-foot setbacks when converting existing structures
  • Height: 16 ft for detached ADUs; up to 18 ft near transit; 25 ft if attached to primary home
  • Lot coverage: Cities may set lot coverage rules but cannot use them to prevent ADUs under 800 sq ft
  • Owner occupancy: Generally prohibited for ADUs; JADUs and separately conveyed units have specific exceptions
  • Permit timeline: Generally 60 days to approve or deny a completed application when an existing dwelling is on the lot
  • Impact fees: Exempt for an ADU of 750 sq ft or less; larger units may be charged proportionately

Bay Area City-Specific Rules

Los Gatos
Max 1,200 sq ft detached; 4-ft setbacks; hillside restrictions apply in some zones
Saratoga
Hillside development review required above elevation 1,000 ft; fire hardening requirements
San Jose
Streamlined ADU permits; pre-approved plans available; reduced fees
Cupertino
4-ft setbacks standard; max 850 sq ft for one-story, 1,000 sq ft for two-story in some zones
Palo Alto
ADU overlay district allows ADUs on most R1 lots; design review for ADUs over 1,000 sq ft
Campbell
Standard state minimums apply; 4-ft setbacks; expedited review available

Rules change frequently. Property-specific verification and the included feasibility work are defined in the proposal.

How We Build Your ADU

From first call to closeout — a documented seven-step process with property-specific scope, assumptions, and agency coordination.

01

Free Feasibility Assessment

We review the property, applicable rules, lot constraints, access, and utilities to identify viable ADU pathways, open questions, and next verification steps.

02

Design & 3D Rendering

The design team develops plans and can use 3D views to review layout and selections. Renderings are design aids; approved documents and the signed scope control construction.

03

Permit Application

We coordinate the permit package, including applicable plans, engineering, energy documentation, and utility information. State timelines apply to qualifying completed applications; actual coordination can involve several agencies.

04

Permit Approval

We coordinate agency communications and plan-check responses when included in scope. Review outcomes and timing remain under the authority of the applicable agencies.

05

Construction

Barcci coordinates construction, inspections, and progress documentation under the signed scope. Pricing method, allowances, exclusions, and changes are governed by the agreement.

06

Inspections & Certificate of Occupancy

We manage every inspection milestone — foundation, framing, rough MEP, insulation, and final. We don't hand over the keys until you have a Certificate of Occupancy in hand.

07

Move-In Ready

Your ADU is complete, permitted, and ready to rent or occupy. We provide a full walkthrough, 1-year craftsmanship warranty, and all documentation for rental listing or refinancing.

How to Evaluate ADU Rental Potential

Rental income is property- and market-specific. Build the decision from current comparable rents, an all-in project budget, financing, taxes, insurance, vacancy, and ongoing maintenance.

Current Rent Comparables

Compare recently leased units with the same city, neighborhood, bedroom count, approximate size, condition, parking, utilities, and rental term.

All-In Project Cost

Include design, engineering, permits, utility work, construction, financing costs, owner selections, contingency, and any work outside the ADU footprint.

Ongoing Ownership Costs

Model vacancy, management, maintenance, utilities paid by the owner, insurance, property-tax effects, repairs, and future capital replacements.

A Simple Planning Model

Gross income
Rent × occupied months
Net income
Gross − annual costs
Cash required
All-in cost − financing
Simple payback
Cash required ÷ net income

This is a framework, not investment, tax, appraisal, lending, or legal advice. Use current local data and qualified advisors. See our sources and editorial standards.

Why Bay Area Homeowners Choose Barcci for ADUs

01

Documented Pricing & Scope

The signed agreement identifies the pricing method, inclusions, exclusions, allowances if any, schedule assumptions, and written change-order process.

02

Full Permit Management

We handle every step of permitting: architectural plans, structural engineering, Title 24 compliance, city submissions, plan check responses, and inspection scheduling.

03

End-to-End ADU Coordination

One design-build team coordinates feasibility, design, engineering, permit responses, construction, inspections, and closeout for the agreed scope.

04

Same Quality as Our Full Remodels

Barcci ADUs are built to luxury residential standards — real hardwood or LVP flooring, custom cabinetry, stone countertops, full-size appliances, and professional finishes throughout.

05

Daily Photo Updates

The proposal identifies the project communication and progress-documentation cadence so expectations are clear before construction.

06

Written Warranty Terms

Applicable workmanship and manufacturer warranty terms are documented in the project agreement and closeout materials.

ADU Frequently Asked Questions

Everything Bay Area homeowners need to know before building an ADU.

Barcci Builders publishes planning ranges of $100,000–$180,000 for garage conversions, $150,000–$280,000 for attached ADUs, and $200,000–$400,000+ for detached ADUs. These are not quotes or market averages. Size, utilities, site conditions, design, selections, and jurisdiction determine the actual proposal.

Use 8–14 months as an initial Barcci planning range from design through completion, not a guarantee. California's March 2026 ADU Handbook says a permitting agency generally must approve or deny a completed ADU application within 60 days when an existing dwelling is on the lot. Corrections, utilities, other agencies, site conditions, and construction scope affect the full schedule.

The answer depends on the local ADU ordinance and unit type. HCD's March 2026 handbook says local maximums must allow at least 850 sq ft, or 1,000 sq ft for an ADU with more than one bedroom. Where no compliant local ordinance applies, a new detached ADU may be up to 1,200 sq ft. A JADU is no more than 500 sq ft within a single-family residence.

Yes. ADUs require permits from the applicable city or county and may involve utilities or other permitting agencies. State law streamlines qualifying applications, but requirements still vary by property and jurisdiction. Barcci Builders coordinates the permit package and plan-check responses for its ADU projects.

Rental rules depend on the ADU type and local ordinance. HCD's March 2026 handbook says local agencies may require ADU rentals to be longer than 30 days, and JADUs cannot be used as short-term rentals. Confirm the current rules with the local agency before using rental income in a feasibility analysis.

A Junior ADU (JADU) is a unit up to 500 sq ft created entirely within the existing footprint of a single-family home — typically converting a bedroom, garage attached to the main house, or unused space. JADUs require a separate entrance, an efficiency kitchen, and a bathroom (which can be shared with the main house). They're the fastest, lowest-cost ADU option.

State law protects several ADU pathways, including an 800 sq ft ADU with four-foot side and rear setbacks when other requirements are met. Converted existing structures and taller units can follow different rules. Confirm setbacks, easements, fire access, utilities, and overlays for the specific property and local ordinance.

Most single-family and multifamily properties in California can have at least one ADU. Properties with a single-family home can have one ADU plus one JADU. Multifamily properties can convert unused non-livable space into ADUs and may be able to add detached ADUs in parking areas. Some properties have restrictions — we assess your specific lot during the free feasibility consultation.

A detached ADU is a new, separate residential structure. A garage conversion turns an existing attached or detached garage into permitted living space. A conversion may need less new foundation and framing, but the existing structure, utilities, code work, and site access still determine feasibility and cost. The dollar ranges on this page are planning estimates only.

An ADU can add usable space and may support rental income, but the effect on appraisal, resale value, taxes, insurance, and cash flow varies. Use local rental comparables and consult qualified appraisal, tax, insurance, and lending professionals before treating an ADU as a financial return guarantee.

ADU Guides & Resources

ADU contractor in Silicon Valley reviewing architectural plans with homeowner
ADU12 min read

ADU Builders in Silicon Valley: What to Look for Before You Hire in 2026

A practical Bay Area residential design-build guide from Barcci Builders. Costs and timelines are planning estimates; verify requirements and current facts at linked sources.

Read More
Modern detached ADU with warm cedar cladding in a Silicon Valley backyard
ADU10 min read

What Is an ADU? The Complete Guide for Silicon Valley Homeowners

Everything Silicon Valley homeowners need to know about ADUs in 2026: types, costs, California law, city-by-city permitting, and the full build process. 116+ Bay Area projects completed.

Read More
Attached ADU vs detached ADU comparison showing a modern accessory dwelling unit built by Barcci Builders in Los Gatos, Bay Area
ADU14 min read

Attached ADU vs Detached ADU in the Bay Area: Pros, Cons, and Costs for 2026

A practical Bay Area residential design-build guide from Barcci Builders. Costs and timelines are planning estimates; verify requirements and current facts at linked sources.

Read More
Modern detached ADU in a Los Gatos backyard generating rental income in the Bay Area with warm exterior cladding and landscaped entry
ADU14 min read

ADU Rental Income in the Bay Area: How Much Can You Make in 2026?

A practical Bay Area residential design-build guide from Barcci Builders. Costs and timelines are planning estimates; verify requirements and current facts at linked sources.

Read More
Modern detached ADU with cedar cladding in a Los Gatos backyard illustrating ADU financing options in California for 2026
ADU14 min read

How to Finance an ADU in California: HELOC, Cash-Out Refi, ADU Loans, and More

A practical Bay Area residential design-build guide from Barcci Builders. Costs and timelines are planning estimates; verify requirements and current facts at linked sources.

Read More
Completed garage conversion ADU in Los Gatos Bay Area with modern exterior and private entrance
ADU14 min read

Garage Conversion to ADU in the Bay Area: Costs, Process, and What to Expect in 2026

A practical Bay Area residential design-build guide from Barcci Builders. Costs and timelines are planning estimates; verify requirements and current facts at linked sources.

Read More
ADU construction by Barcci Builders

Ready to Build Your ADU?

Start with a feasibility conversation. We'll identify viable pathways, open questions, verification steps, and the route to a property-specific proposal and schedule.

No obligation. CA License #1086047.

Call NowFree Quote